13.06.2009

Traffic lights on the access road to the Ober Iss Alm.

The municipality is building a hydroelectric power station at the entrance to the Oberbergtal.

The municipality is building a hydroelectric power station at the entrance to the Oberbergtal. During construction, traffic has to be diverted onto a bypass road. On the bypass road, traffic will be controlled by traffic lights because of narrow sections, which will result in short waiting times.

Gallery

‹ Back to overview